internal Refurbishment - Fairford

This project incorporated a full refurbishment to the property. The brief, to let in as much natural light as possible and modernise.

Before

After

Warehouse Refurbishment - Ashton Keynes

Project brief, to decorate and level an existing sloping floor slab with minimal disruption.

Cleaning and prep before spray painting

New concrete floor prep including steel reinforcement

Finished project incorporating top dressed power floated concrete slab

Roof Alterations - Fairford

Existing roof elavation.

Steel sections ready to be craned in to position.

Steel dorma sections being lowered in to position.

Finished project with new powder coated flat roof dormers in place.

Renovations

Bathrooms 

Kitchens

Decorating 

Wall & floor tiling

Window & door replacement 

Electrical rewires 

Replacement central heating 

Carpentry & joinery 

Plastering